One step at a time. One project at a time.

Every year since we bought our first house in our early married years (a real honest to goodness fixer upper), we’ve kept to a plan of home improvements as we could afford them. Limiting ourselves to two projects a year, helped motivate us without overwhelming us. It also kept it affordable. Over the years, we’ve stuck to it in every house we lived – even when it was a low income rental when Dan went back to school. It kept us thinking, planning, and making things better for ourselves, while keeping projects in perspective and manageable, All these many years later, we still follow the same formula. One inside project. One outside project.

Some have been big projects – like 2015’s kitchen, and the 2021 greenhouse.  
Some have been smaller projects – like planting a tree, painting a wall, replacing a fixture or a single window or laying some reclaimed brick in the garden paths. The outside project is in the warm months, the inside project is reserved for the cold months. No one wants to waste beautiful summer days working in the house.

hard to see the glass brick patio in this little bistro area off the kitchen door, but this is where it is. To the right, you can catch a glimpse of a 45 gallon rain barrel hooked up to the rainspout

One year we scored some glass bricks from a friend’s reno project. I was so happy! Dan – not so happy. They sat around for a year or two, Dan trying to talk me into getting rid of them, (hoping they’d break so I’d have to) and me just ‘knowing‘ they had a higher purpose in my life. LOL.

In 2002 a big bush winter killed and had to be removed. Just outside the kitchen door, which was very provident! I had the boys chop it down and dig the roots out. We could have planted another tree, but I had visions of a little bistro-type area. Zack and Joseph were willing to make my vision come to life. Dan was not convinced it would work, and didn’t like the idea of the glass bricks being a floor, so he kept his distance from what he was sure was a doomed project. The boys created a base out of sand from the sandbox, and laid the glass bricks as if they were ‘bricks’. Truth be told, I only expected those bricks to last a year or two. None of us were very hopeful about what the winter might do to them, but we had nothing to lose by trying, and everything to gain.  So we did it anyway.

These pictures were taken 14 years later. We’ve had to replace a brick or two from time to time, but not more than 6 or 8 in total. They’ve sunk a little bit, owing to our amateur job of packing the base layer in. But they’re still wonderful, and I still love the spot on our east side, just outside the kitchen door. The perfect spot for a summer breakfast, or a dinner in the shade.  In the picture above you can see the strings from the hammock (on the left) strung from this tree to the one next to it.

In 2016, our inside project was a big one that took 10 times longer than we anticipated. We created a bathroom downstairs adjoining a room that we call “Gramma’s room” for my mom. This was the first big project in preparation for my mother coming to live with us, hence the name “Gramma’s room“. We used to call it Uncle Luke’s room, but things have changed. It was a very big deal. The first project quite so all inclusively complicated. When it was done, we considered having a “Bathroom Done Party” to celebrate. If you came to visit in the months after it was finished, we probably invited you to come see it. LOL. We rejoiced for months and I found myself going down to look at it several times a day for the first few weeks.

We had started the bathroom in January and finished the end of June. When I use the word “WE”, I am of course referring to the “royal WE”. Meaning Dan, although I do the clean up when things get done. There were lots of domino projects that had to get done simultaneously to make it possible. It was a big project that impacted every room downstairs before it was done, and our grandchildren couldn’t play downstairs for so long, they forgot we had a downstairs.

The adjoining bedroom “Gramma’d bedroom” would be the next year’s inside project, but that was a subject we avoided discussing for a very long time. Not surprisingly, the outside project that year was a small one. It was tempting to not do anything that year, but we had made the decision long ago, and that meant we would make one improvement a year outside and one inside. And sticking to it was important.

We painted the fence panel behind our bistro area in the backyard. I know. Big deal. It only took me one day. (We needed easy because the bathroom sucked all our energy.) But easy doesn’t mean ‘do nothing‘. It is important to be flexible with our energy and our expenses, and to not bite off more than we can chew, or afford. Some jobs are big and some are just small. But each one moves us forward, and brings with it a sense of accomplishment. It is just as important to stick to the plan, and move forward. Progress means forward. One step at a time.

Do you have a plan for fixing things up in your little world? I’d love to hear it.


Warmly,

Cindy Suelzle